Key takeaways
- Use granite where traffic, grit and cleaning chemicals concentrate, such as entrances, lift lobbies and mall corridors, and marble where appearance leads.
- Order a whole commercial floor from one lot and reserve 3–5% spare stone, because natural stone changes shade from block to block.
- Entrances need a honed or brushed finish, a canopy and recessed matting, since polished stone becomes slippery when wet.
- At our November 2026 quote ranges a 5,000 sq ft lobby costs about PKR 3.3–6.0 million installed in Nagar Parkar Grey, before wastage.
- Our contractor programme quotes 2–3 weeks from template to fitting for stocked slabs and 3–5 weeks for onyx and rare fancy lots.
The short answer
The best marble for commercial buildings is a calm, consistent stone bought from one lot, such as Verona Plain or Sunny Grey, used where looks matter, with granite such as Nagar Parkar Grey at entrances, lift lobbies and busy corridors. At our November 2026 quote ranges these cost PKR 560–1,200 per sq ft installed.
A commercial floor is judged differently from a home. It takes hundreds or thousands of people a day, trolleys, wheelchairs and cleaning machines; it must look even across thousands of square feet; and it has to stay safe when it rains. This guide covers which stone suits each type of building, granite against marble for traffic, slip at entrances, keeping colour consistent across large lots, upkeep, cost and lead times, and how builders and contractors can order.
How we priced this: stone rates are our current catalogue quote ranges per square foot as of November 2026. They are installed prices in our service area that include cutting, a standard polished finish, fitting and sealing on fitting day. Mitres, inlays, special finishes and freight outside our fitting cities are itemised on the quote. Trade and volume pricing for builders is quoted separately. Floor areas in the examples are our assumptions.
What each type of building asks of the stone
Every commercial building has a few zones that take most of the wear: the entrance, the main lobby, the lift lobby and the corridors between them. Specify those first, then the lighter-duty areas.
| Building | Hardest-working zones | What matters most | Stones to consider |
|---|---|---|---|
| Office | Entrance, reception, lift lobbies | Clean, consistent look; re-orderable stone | Verona Plain, Sunny Grey, Nagar Parkar Grey |
| Hotel | Porte-cochère, lobby, banquet pre-function | Impression, comfort, colour under warm light | Ziarat White, Verona Plain, Jet Black accents |
| Hospital or clinic | Entrance, OPD waiting, corridors | Resistance to disinfectants, few joints, easy repair | Granite, Chips Dana |
| Mall or retail | Entrances, atrium, main malls | Trolleys, grit, long opening hours | Galaxy Black, Nagar Parkar Grey, Swat White Granite |
| Apartment block | Ground lobby, lift lobbies, stairs | Budget per sq ft, consistency floor to floor | Sunny Grey, Medium White, Denso |
| School or college | Corridors, stairs | Low cost, repairability | Chips Dana, Denso |
Offices
Offices want a quiet, uniform floor that suits any tenant fit-out and can be matched years later when a floor is refurbished. Verona Plain is the obvious beige choice: a flat honey-beige field that our catalogue notes is specified by the thousand square feet in hospitality, with supply consistent enough to re-order. Sunny Grey is the grey equivalent, with a tone that forgives small differences between slabs. Use a granite strip at the entrance and in front of lift doors.
Hotels
Hotels can justify more expressive stone in the lobby, a polished white or a feature inlay under the chandelier, because the lobby sells the hotel. Ziarat White comes from large, consistent blocks that keep seams few on long runs. Rooms, corridors and banquet areas are often carpeted, so stone there is limited to thresholds, lift lobbies and washrooms. Inlaid borders and medallions in Design Patti or Jet Black add detail without changing the main stone.
Hospitals and clinics
Hospitals clean floors constantly, often with chlorine-based or acidic disinfectants chosen by the infection-control team. Acids etch marble and harsh cleaners dull it. Granite resists them far better, and Chips Dana terrazzo, which our catalogue notes is widely used in schools and hospitals across Punjab, is seamless and repaired with the same mix. Whatever you choose, agree the cleaning chemicals with the hospital before ordering, keep joints tight and sealed, and use honed or brushed finishes where floors may be wet.
Malls and retail
Malls take the heaviest abrasion: grit from car parks, trolleys, cleaning machines running every night and very long hours. Granite such as Galaxy Black, which our catalogue describes as hard enough for commercial entrances, and Nagar Parkar Grey belong in the main circulation, with marble kept to shopfronts, walls and quieter atria.
Is granite or marble better for high-traffic commercial floors?
Granite is better for high-traffic floors because it is much harder than marble (about 6 to 7 on the Mohs scale against about 3) and is not etched by acidic cleaners. Marble is better where appearance and warmth lead and traffic is moderate, and it can be re-ground and re-polished on site when it wears.
| Factor | Granite | Marble |
|---|---|---|
| Scratch resistance | High; grit does little damage | Lower; wear paths appear on busy routes |
| Acid and disinfectants | Largely unaffected | Etched by acids; dulled by harsh cleaners |
| Look | Speckled, crystalline grain | Calm fields and veining; warmer, softer look |
| Colour consistency over large areas | Very good in grey granites | Good in plain grades if bought from one lot |
| Repair | Hard to re-polish on site | Re-ground and re-polished on site |
| Our installed range (PKR / sq ft) | 650 – 1,700 | 450 – 1,600 for the calm grades in this guide |
Many good commercial floors use both: a granite apron at the door and in front of lifts, where grit and wet feet arrive, and a marble field across the lobby. The granite takes the abrasion so the marble does not. Our marble vs granite guide compares the two in more depth, and the granite range shows every colour we cut.
Granites that suit commercial floors
- [Nagar Parkar Grey](/products/nagar-parkar-grey) (PKR 650–1,200): even salt-and-pepper grain; our catalogue notes that large orders match closely, which is exactly what a big floor needs. Available brushed and leathered.
- Galaxy Black (PKR 900–1,700): black with silver mica; for entrances, borders, steps and lift lobbies. Brushed or leathered hides footmarks better than polish.
- Khyber Black Granite (PKR 850–1,600): dense, near-solid charcoal; for thresholds, signage and borders.
- Swat White Granite (PKR 720–1,350): among the lightest local granites; keeps a mall or hospital corridor bright.
- Balochistan Red Granite (PKR 780–1,450): holds colour in sun and rain; for entrance cladding, columns and feature bands.
How do you stop slips at commercial entrances?
Slips at entrances are prevented by a matte finish on the first few metres of floor, a canopy over the door, recessed matting inside it, and a cleaning routine that keeps the floor dry in rain. Polished stone at a door is the single most common cause of slip complaints in commercial buildings.
- Change the finish at the threshold. Use a honed or brushed stone outside and for the first stretch inside, and keep the polish further in where floors stay dry.
- Recess a matting well inside the door, long enough to take several footsteps, so water and grit come off before people reach the stone.
- Cover the approach. A canopy or porch keeps rain off the outer steps; external steps need a brushed or textured finish and a visible nosing.
- Ramps need a textured finish and handrails, never polished stone.
- Plan for the monsoon. Put out extra mats, and have staff dry-mop entrances during and after rain.
Slip resistance can be tested on site with standard methods, and some clients and insurers ask for it. If your project needs a test result, specify it in the tender and test a sample area in the finish you intend to use before ordering the full quantity. Our guide to polished, honed and leathered marble explains how each finish behaves wet.
Keeping colour consistent across a large order
Natural stone changes shade from block to block and even within a block. On a house floor that is character; across a 20,000 sq ft office it becomes a patchwork if it is not managed. Consistency is the issue that most separates commercial stone buying from domestic.
- Choose a forgiving stone. Plain grades such as Verona Plain, Sunny Grey and Nagar Parkar Grey hide small differences; heavily veined or fancy stones magnify them.
- Order the whole area from one lot, and have the supplier reserve it before work starts. A building delivered in three separate purchases will show three shades.
- Approve a reference. Keep signed samples or photographed reference slabs, and check every delivery against them.
- Blend on site. Ask the fitter to mix pieces from several crates across the floor rather than laying one crate per room, so any slight shift is spread out.
- Order spares. Reserve about 3–5% extra from the same lot for future repairs and tenant changes, and store it on site.
- Plan re-orders. For buildings that will be fitted out in phases, choose a stone with steady supply and confirm the supplier can match it later.
Our guide to checking marble grades and quality explains what to look for when you inspect a lot, and marble slabs vs marble tiles helps decide between gauged tiles and cut-to-size slabs for large floors.
Lift lobbies, corridors, stairs and walls
Lift lobbies
Lift lobbies concentrate traffic into a few square metres and take the wheels of furniture, cleaning carts and luggage. A granite or dark marble band in front of each lift door, flush with the floor, takes that wear and frames the doors. Coordinate the lift sill level with the stone thickness and bed so the finished floor meets the sill exactly.
Corridors
Long corridors show every wear path down the middle. Honed stone hides this better than polish, and a contrasting border strip along each wall keeps the eye off the centre. Denso, which our catalogue lists for commercial corridors, is a tight-grained grey that stays semi-matte even when polished and helps hide scratches.
Stairs
Public stairs need honed or brushed treads, a contrasting or textured nosing so each step edge is visible, and consistent riser heights. Granite treads with marble risers are a durable combination. Our black granite stairs guide covers tread thickness and nosings.
Wall cladding
Interior walls in lobbies and lift lobbies are the safest place for polished marble and feature stone, because nobody walks on them. Cladding high internal walls and any external façade needs mechanical fixings designed by your structural engineer, not adhesive alone. Our guide to stone wall cladding covers fixing methods, and the marble thickness guide explains when 2 cm or 3 cm stone is needed.
Maintenance and maintenance contracts
A commercial stone floor is only as good as its cleaning regime. Most buildings either train their own housekeeping staff or hire a floor-care company on an annual maintenance contract. Either way, write the routine into the handover documents.
| Frequency | Task |
|---|---|
| Daily | Dry dust-mop or vacuum grit; damp mop with a pH-neutral stone cleaner; empty and clean entrance mats |
| Weekly | Machine scrub with soft pads and neutral cleaner in busy areas; check for stains and treat early |
| Monthly | Inspect grout, sealant and any loose or hollow pieces; buff high-traffic routes |
| Yearly | Re-seal light and absorbent stone; replace worn entrance matting |
| Every few years, as needed | Machine grind and re-polish or re-hone worn marble areas |
- Ban acid cleaners on marble. Teezab, tile acid, vinegar and descalers etch it. Housekeeping contractors often bring a universal cleaner; check the label.
- Specify pads, not brushes, for scrubbing machines on polished stone, and the right grit for honed floors.
- Keep a stain kit with a poultice and neutral cleaner, so oil and tea are dealt with on the day.
- Ask for a written method statement from any contractor before they touch the stone, and test new products on a spare piece.
Our guides on how to clean marble floors and marble polishing explain methods in more detail, and are a useful brief for housekeeping teams.
Cost for large commercial areas
As of November 2026, our installed quote ranges for the stones in this guide run from PKR 180–420 per sq ft for Chips Dana to PKR 850–1,600 for Ziarat White. On large orders, the choice of stone and the share of granite moves the total far more than any other line.
| Stone | PKR / sq ft | Total, PKR |
|---|---|---|
| Chips Dana | 180 – 420 | 900,000 – 2,100,000 |
| Denso | 450 – 820 | 2,250,000 – 4,100,000 |
| Sunny Grey | 560 – 1,000 | 2,800,000 – 5,000,000 |
| Verona Plain | 600 – 1,100 | 3,000,000 – 5,500,000 |
| Nagar Parkar Grey | 650 – 1,200 | 3,250,000 – 6,000,000 |
| Ziarat White | 850 – 1,600 | 4,250,000 – 8,000,000 |
| Galaxy Black | 900 – 1,700 | 4,500,000 – 8,500,000 |
A mixed scheme is common: for example, 4,500 sq ft of Verona Plain in the lobby and corridors with 500 sq ft of brushed Galaxy Black at entrances and lift lobbies comes to about PKR 3.2–5.8 million at the same ranges. Inlays, borders, stairs, wall cladding and freight are separate lines. Our cost estimator works out installed figures for any of our stones, and builders and contractors can request trade and volume pricing as described below.
Ordering for builders and contractors
Commercial stone is bought on a programme, not off the shelf. Order early, lock the lot and tie deliveries to site readiness.
| Order type | Typical lead time |
|---|---|
| Stock floor tile sizes | Load from Lahore in 3–5 days |
| Stocked slabs, cut to drawings | 2–3 weeks from template to fitting |
| Onyx and rare fancy lots | 3–5 weeks from template to fitting |
| Container lots selected at the quarry | 4–8 weeks from block selection |
- Send drawings with every zone measured, the finish for each, and the fit-out programme.
- Request samples and photographs of the actual lot, and sign off a reference.
- Agree the reserve quantity, spare stock and the delivery schedule floor by floor.
- Ask for cut sheets and labelled crates so pieces arrive by area and are not sorted on site.
- Book templating and fitting once screeds are cured and lift sills, door frames and services are fixed.
Fabricators, builders and developers buying slabs in quantity can open a trade account for wholesale slabs, with per-slab, bundle and container pricing. Contractors who want layouts, cut sheets and scheduled templating can apply to our contractor programme, and our stone installation page explains how our crews template and fit. The glossary entry on lead time shows where the weeks go. For a place of worship, see our guide to masjid floors, and when comparing suppliers, our supplier checklist helps. Send drawings for a free itemised quote.
Written by
The Captivating Marble Design Team
Fabricators, templaters and stone designers
We template, cut and install natural stone every day and write about what we learn — pricing, layouts, care and the mistakes we help clients avoid.
Book a free design consultation